右上角链接

Time of issue:2020-09-14 17:23:23

      HOME  Guardex Group  Product  

imgboxbg

Media Center

Current location:
Homepage
/
/
/
How should we solve the local water leakage problem in the floor heating room?

How should we solve the local water leakage problem in the floor heating room?

(Summary description)

How should we solve the local water leakage problem in the floor heating room?

(Summary description)

Information

After the beginning of winter, a wave of cold air strikes, the cold wind blows, the temperature drops sharply, central heating has begun in most northern areas, installed floor heating families have also opened the heating.

Ground heating heating balance, heating comfort, has gradually become an important part of the smart home, has won great recognition and popularization.Just when the floor heating is in use, if you also encounter a leakage problem, it can be particularly a headache.

Floor heating leakage (water heating) is rarely pipeline leakage, this kind of problem need to contact quality assurance manufacturer to solve, we said today floor heating room local leakage, refers to the cold indoor temperature, near the window floor pipe condensation water, to the lower room leakage, and moldy damp phenomenon in the upper problem.

How should we solve this problem?In fact, it is not complicated, the routine operation can be:

1. First, remove the floor near the upper geothermal side of the window;

2. Check the laying of the geothermal heating pipe and contact the construction party and the heating company to avoid the damage to the ground heating pipe caused by the construction;

3. Move the geothermal heating pipe to the middle of the room, so that the distance of the geothermal heating pipe from the window reaches 800mm;

4. Remove the lower insulation layer of the geothermal heating pipe to the floor surface of the structure and clean and repair the structural surface, brush 2mm thick flexible waterproof coating or flexible waterproof mortar on the structural surface, and lining the grid cloth to enhance;

5. Restore the thermal insulation layer, geothermal heating pipe, ground surface layer and other related structural levels to the original state.

In order to avoid damage to the laid floor heating pipe, insulation layer and reflection film, professional workers shall treat the leakage according to the construction drawings; when choosing flexible waterproof coating, the fracture extension rate and low temperature resistance shall be fully considered to meet the deformation of the insulation benzene plate under the floor heating pipe and the heat expansion and cold shrinkage caused by pipe temperature change.

Jiagushi AE-1000 penetration high elastic polymer modified asphalt waterproof coating is an upgrade of AE-900, higher extension rate, stronger adhesion, cheaper price, soaking water not emulsified, more stable performance, is very suitable to solve the local leakage of this floor heating room.

For more about AE-1000, you can scan the code to add Dr. Yao from Tsinghua University for consultation!

Scan the QR code to read on your phone

Related information

Previous page
1

Related information

Previous page
1

TOP

点我咨询

Contact Info

Consultation Hotline: 400-100-6798
Email: szguardex@163.com
Address: Room 1202, Building No. 1-A, Yangchenghu International High-tech Park, No. 116, Chengyang Road, Chengyang Street, Xiangcheng Economic and Technological Development Zone, Suzhou 

 

ewm

Scan QR code

优选品牌

LINKS:   GUARDEX

 

Copyright @2021 Suzhou Guardex New Material Technology Co., Ltd.  Powered by www.300.cn 苏ICP备112200588-1号