Waterproof construction should be paid attention to several aspects
- Categories:Company News
- Author:
- Origin:
- Time of issue:2021-11-22 16:14
- Views:
(Summary description)
Waterproof construction should be paid attention to several aspects
(Summary description)
- Categories:Company News
- Author:
- Origin:
- Time of issue:2021-11-22 16:14
- Views:
Generally speaking, urban construction and urban planning is inseparable from construction, and waterproof work must be done.If, due to the recent weather changes, often rainy, so each building and home capital Duo do a good job of waterproof work.Below, we will introduce for you the several aspects that we need to pay attention to in the construction:
I. Construction Management Preparation If you can win the bid, we should immediately seize the time to set up the project management department, and organize and command the project department to make the following construction management preparations.
2. According to the requirements of the construction organization chart of the bidding document, organize the main leaders and technical personnel in place to conduct the contract disclosure and technical disclosure.All participants must clarify the post responsibilities, division of labor to the people, and do the connection and coordination with the civil construction unit under the organization of the construction unit, to ensure the smooth progress of the project.
Note III. It is required to further do the construction organization design on the basis of the tender and report to the construction unit and on-site supervision for examination and approval.
IV. Inspect and accept the grassroots under the participation of the owner, site supervision, civil construction units and relevant units.
V. Be familiar with the construction drawings, determine the project quality plan, construction plan, operation guidance plan and schedule arrangement, and determine the personnel and material supply plan according to the actual situation on the site, and do a good job in the arrangement of temporary construction and production housing.
6. Organize the necessary construction tools in place, and conduct the necessary debugging and inspection of the site construction equipment according to the regulations, to ensure the normal operation of the construction equipment.According to the characteristics of tight project, all tools and equipment must be prepared, complete and prepared.
(1) Implement the material supply plan
Under the participation of the on-site supervision engineer, earnestly conduct the inspection of the materials, and sample for inspection if necessary.
(2) Material preparation
Choose the effect according to the waterproof design, the selected materials to ensure the quality.
(3) Construction equipment
The construction unit shall, according to the actual requirements of the construction site, all the auxiliary materials shall adopt the materials that conform to the national industry standards, such as sealing paste, cold base oil, etc.And shall be equipped with air compressor, spray pressure tank, liquefied pressure gun, high pressure hair dryer, wipe, scraper, seat belt, small flat shovel, blender, brush, special flame gun, wallpaper knife, rope, rollers and other necessary equipment, to facilitate the construction of the site.
Scan the QR code to read on your phone

Contact Info
Consultation Hotline: 400-100-6798
Email: szguardex@163.com
Address: Room 1202, Building No. 1-A, Yangchenghu International High-tech Park, No. 116, Chengyang Road, Chengyang Street, Xiangcheng Economic and Technological Development Zone, Suzhou
Copyright @2021 Suzhou Guardex New Material Technology Co., Ltd. Powered by www.300.cn 苏ICP备112200588-1号