右上角链接

Time of issue:2020-09-14 17:23:23

      HOME  Guardex Group  Product  

imgboxbg

Classic Case

Daling water purification plant concrete maintenance and waterproof

  • Categories:New Engineering
  • Author:
  • Origin:
  • Time of issue:2021-11-26 11:39
  • Views:

(Summary description)Project address: Daling Automobile Logistics and Economic Development Zone, South of Jiayi Street, east of B 16 Road, north of Jiazi Street<br> Construction area: 20,000 square meters<br> Product use: concrete maintenance and waterproof

Daling water purification plant concrete maintenance and waterproof

(Summary description)Project address: Daling Automobile Logistics and Economic Development Zone, South of Jiayi Street, east of B 16 Road, north of Jiazi Street<br>

Construction area: 20,000 square meters<br>

Product use: concrete maintenance and waterproof

  • Categories:New Engineering
  • Author:
  • Origin:
  • Time of issue:2021-11-26 11:39
  • Views:
Information

Project Name: Gongzhuling City Ring Chang Economic Development Zone Water Integration Project (Phase I)

Project address: Daling Automobile Logistics and Economic Development Zone, South of Jiayi Street, east of B 16 Road, north of Jiazi Street

Construction area: 20,000 square meters

Project type: New building

project context:
Water purification plant, supporting water supply network, sewage pipe network and rainwater sewage diversion project in Daling Town and Logistics Park, 2 water treatment plant and water pump network and sewage pipe network in Xiangshui Town and Agricultural Science and Technology Park.After the completion of the project can greatly improve Fanjiatun town and princess ridge economic development zone, Daling town, industrial park and logistics park, the town of water and agricultural science and technology park water quality, alleviate water supply tension, improve the sewage treatment system, protect the ecological environment, promote the infrastructure construction of towns and development zone, improve residents' quality of life, speed up the development of changchun princess ridge city.
The design scale of the water purification plant is 20,000
㎡, and the designed water quality meets the Sanitary Standards for Domestic and Drinking Water (GB5749-2006).

Waterproof requirements: inner wall of filter pool of sewage treatment plant and water purification plant, inner wall of combined pool, inner wall of sedimentation tank

Products: SK series inorganic nanosilicate permeable crystalline waterproof protective material, acrylate, impermeability no. 1, anti-seepage mortar

Product use: concrete maintenance and waterproof

Construction process:
The first time sprinkling water wet base surface the first time Jiaji fairy water the second time sprinkling water the second time Jiaji fairy water the third time sprinkling water wet maintenance for 3 days to complete

Scan the QR code to read on your phone

工程案例

工程案例

TOP

点我咨询

Contact Info

Consultation Hotline: 400-100-6798
Email: szguardex@163.com
Address: Room 1202, Building No. 1-A, Yangchenghu International High-tech Park, No. 116, Chengyang Road, Chengyang Street, Xiangcheng Economic and Technological Development Zone, Suzhou 

 

ewm

Scan QR code

优选品牌

LINKS:   GUARDEX

 

Copyright @2021 Suzhou Guardex New Material Technology Co., Ltd.  Powered by www.300.cn 苏ICP备112200588-1号