The bridge deck of the urban viaduct is waterproof

  • Categories:New Engineering
  • Author:
  • Origin:
  • Time of issue:2021-11-26 15:37
  • Views:

(Summary description)Main use of Jiagushi: waterproof<br> Project address: Urumqi, Xinjiang<br> Construction time:2015.08.19~09.22<br> Construction area:50000㎡

The bridge deck of the urban viaduct is waterproof

(Summary description)Main use of Jiagushi: waterproof<br>
Project address: Urumqi, Xinjiang<br>
Construction time:2015.08.19~09.22<br>
Construction area:50000㎡

  • Categories:New Engineering
  • Author:
  • Origin:
  • Time of issue:2021-11-26 15:37
  • Views:
Information

Project Overview:
The project is located in Section 1 of the first phase of the Altay Road Elevation Project (north of Henan Road-Qingcheng Lane intersection). It is a key urban construction project in 2015. The route length of the first phase of the project is 7.4 kilometers, and the length of the new elevated road is 5.7 kilometers.The newly built viaduct is two-way four lanes, with a bridge deck width of about 20m, a single bridge deck plate of 1m wide, 8cm thick reinforced concrete and a strength of C40.
The bridge deck is fully hairy on the concrete surface layer before making the waterproof layer, and finally the mixture of asphalt concrete and asphalt horse hoof fat gravel is poured on the waterproof layer.The original waterproof material is PB fiber reinforced polymer modified asphalt waterproof coating. Due to the large wind in Xinjiang and the large temperature difference between day and night, there may be insufficient maintenance in the construction, resulting in the concrete interior is not dense, and the surface is prone to turtle-like cracks.
The construction process of original PB fiber reinforced polymer modified asphalt waterproof coating is complex, with high requirements on construction equipment and great impact on the environment, and the waterproof layer is easy to be damaged by high temperature asphalt pavement. Therefore, Jiushi is finally chosen instead replace polymer modified asphalt waterproof coating.

construction procedure:
The first time sprinkling water wetting the base surface the first time (150ml / m2) the second time (100ml / m2) the third time sprinkling film maintenance for 3 days

Effect evaluation:
After 7 days, the closed water test was done and completely passed through. Up to traffic, the operation is good, especially the position of the post-pouring belt, spraying other traditional materials has leaked, while the post-pouring belt of spraying has not had leakage, and the waterproof effect is good.

Scan the QR code to read on your phone

工程案例

工程案例

TOP

点我咨询

Contact Info

Consultation Hotline: 400-100-6798
Email: szguardex@163.com
Address: Room 1202, Building No. 1-A, Yangchenghu International High-tech Park, No. 116, Chengyang Road, Chengyang Street, Xiangcheng Economic and Technological Development Zone, Suzhou 

 

ewm

Scan QR code

优选品牌

LINKS:   GUARDEX

 

Copyright @2021 Suzhou Guardex New Material Technology Co., Ltd.  Powered by www.300.cn 苏ICP备112200588-1号