右上角链接

Classic Case
Rear water tunnel leakage maintenance
- Categories:Renovation Engineering
- Author:
- Origin:
- Time of issue:2022-08-31 14:36
- Views:
(Summary description)Guardex main use: tailwater tunnel back water leakage maintenance<br> Project Address: Chuzhou, Anhui Province<br> Construction time: 2022.07
Rear water tunnel leakage maintenance
(Summary description)Guardex main use: tailwater tunnel back water leakage maintenance<br>
Project Address: Chuzhou, Anhui Province<br>
Construction time: 2022.07
- Categories:Renovation Engineering
- Author:
- Origin:
- Time of issue:2022-08-31 14:36
- Views:
Project Overview: Langya Mountain Pumped Storage Power Station is located at the foot of Langya Mountain in the southern suburb of Chuzhou City, Anhui Province. It is one of the major energy construction projects in Anhui Province during the "Tenth Five-Year Plan" period. The total investment of the power station is 2.3 billion yuan. The high water pressure makes the original waterproof layer of tail-water tunnel fail.
Guardex main use: tailwater tunnel back water leakage maintenance
Application products: Jiagu treasure, ZJ-ⅳ superfine crack injection slurry, SK-2 nano silicon ion penetration modification agent (waterproof and impermeable), X13 high strength alkali resistant repair agent, X14 composite polymer alkali resistant fiber, TW-30 water-based flexible anti-condensation special coating
Project Address: Chuzhou, Anhui Province
Construction time: 2022.07
Scan the QR code to read on your phone

Contact Info
Consultation Hotline: 400-100-6798
Email: szguardex@163.com
Address: Room 1202, Building No. 1-A, Yangchenghu International High-tech Park, No. 116, Chengyang Road, Chengyang Street, Xiangcheng Economic and Technological Development Zone, Suzhou
Copyright @2021 Suzhou Guardex New Material Technology Co., Ltd. Powered by www.300.cn 苏ICP备112200588-1号