All
  • All
  • Product Management
  • News
  • Introduction
  • Enterprise outlets
  • FAQ
  • Enterprise Video
  • Enterprise Atlas

AE-1000


Classification:

Engineering renovation

AE-1000


This product with emulsified asphalt as the main material, and then by adding modified polymer, fillers and additives, after a specific production process, finally make the modified polymer, fillings and additives can be fully dissolved in asphalt, so as to form a homogeneous system, at the same time, add crosslinking, coupling, capacity and bonding additives, through their physical and chemical modification of the mixture, finally prepare comprehensive performance of good modified asphalt-based waterproof coating.

The reason why this technology can improve the thermal resistance of asphalt heat and low temperature flexibility is that a continuous mesh system is formed inside the mixture, so the physical properties such as fracture elongation of asphalt are also enhanced.

at the same time, Due to reactions such as chemical cross-linking occurring inside the mixture, resulting in the content of polar molecules, Thus leads to the formation of hydrogen bonds on the molecular chain and the interior of hydrogen and covalent bonds, The compatibility between the polymer polymer and the bitumen base is enhanced, Therefore, the integrity of its structural space is relatively stable, Its bond strength, cohesion, and stability have been improved, Thus, the physical effect of bitumen molecules and the base surface was changed, So that the waterproof coating can be firmly bonded to the base level, Thus, it can prevent the coating of the drum, foaming, peeling and other bad phenomena, Ensure the service life of the coating

.

 

Scope of application

Waterproofing of building foundations; gutters, eaves, terraces, parapets, etc.; indoor waterproofing of bathrooms and kitchens (walls); roofing systems such as asphalt roofs and concrete roofs. Not suitable for use in cold areas where the temperature is below -10°C for a long time.

 

product advantages

1. Water-based environmentally friendly paint, no solvent and no irritating odor;

2. Outstanding waterproof performance, high elasticity and good durability;

3. Easy construction, ready for use after opening the cover;

4. Good bonding performance with the substrate, excellent bonding ability with commonly used building materials, vertical surface waterproofing can be directly tiled;

5. When used with the special primer of Jiagus, the concrete base surface can be prevented from bulging or peeling.

 

Implementation Standards

JC/T 408-2005 "Water-emulsified asphalt waterproof coating"

 

Product construction process

1. Base surface treatment: Ensure that the construction base surface is flat and solid. If there are sanding, peeling, water seepage, hollowing, cracks, etc., corresponding treatment should be done. The surface must be clean and tidy without loose soil, debris, oil stains, etc., and the floating slurry on the concrete surface must be ground off before construction, and the base surface must be cleaned;

2. Construction of additional layers of details: For details such as corners, drains, vents, pipe roots, expansion joints, etc., cracks should be filled or smoothed (radian diameter 30-50mm), and the positive corners should be polished into a circular chamfer with a radius of not less than 10mm. Then, apply a layer of material, lay the mesh cloth, and apply another layer of material until it is completely covered.

3. Large-area waterproofing construction: Large-area construction should be applied in 2-3 coats. The next coat should be applied after the previous coat is dry, and the coating directions are perpendicular to each other.

 

Precautions

1. Ensure the safety of operation and confirm the operating range (do not carry out construction on windy and sandy days, the construction temperature should be between 5-35℃, the relative humidity should be below 85%, and outdoor construction should not be carried out if it is expected to rain within 36 hours);

2. During the construction process, it is strictly forbidden to step on the wet waterproof layer, and it is not allowed to wear shoes with nails during construction. After the construction is completed, the coating must be protected to avoid damage;

3. To prevent the water-based paint from bulging and bubbling, a closed primer should be applied first. For details, please consult the manufacturer's technical staff;

4. The thickness of a single coat should not exceed 0.5mm. Avoid construction when the base surface temperature is higher than 35°C, as bulging and sticking problems are very likely to occur.

Product Message