News
Concrete protection of the middle line of the South-to-North Water Diversion Project
Project Overview:
South-to-north water diversion project, from the largest tributary of the Yangtze river in the middle and upper reaches of danjiangkou reservoir, danjiangkou reservoir east xichuan county nine key project canal excavation main canal, through the watershed of the Yangtze river basin and huaihe river watershed Fangcheng pass, along the Midwest north China plain, in xingyang through the tunnel through the Yellow River, north along the beijing-Guangzhou railway, from the Beijing Summer Palace Tuancheng lake water transport project.
Main use of Jiagushi: concrete protection
Project address: Zhengzhou City, Henan Province
Construction time: 05,2017
construction procedure:
First time sprinkling wetting base surface first time (150ml / ㎡) second time sprinkling second time (100ml / ㎡) third time sprinkling wet maintenance for 3 days